I rearranged the USB ports to make the design slimmer.
New Design.
Old Design
I rearranged the USB ports to make the design slimmer.
New Design.
Old Design
Looks great! What kind of cable would be used to connect this to the UART ports on the vescs? Just two JST cables?
Love this! Were you able to get a production estimate?
@kylem21 Yes regular JST cables as usual. @uigiroux Almost there, I will post an estimate using different batch quantities.
Lol, just dying to learn more about this! Just love the idea so much!
Wow, this look so great! Cant wait to get one of this!
Jumping late here, very exciting news !
Very cool.
So it’s using the truck hardware for mounting it looks like. Any thoughts on making a spacer or mounting bracket for decks mounted drop through? And how that might affect the wire placement?
Also I’m guessing it’s safe to assume the case is being made strong since the hardware for the skateboard trucks needs to be torqued down fairly hard.
I was wondering about this too. For regular mounting, I was wondering if the top side screws could be the type that are hollow and allow for another screw to screw into the top of that screw. So you would mount your trucks like normal, then just screw over the top of that the Proton, and they’d attach into the trucks screws.
Like this, but with the proper types of screws, not these.
Though a special type of mounting plate for drop through style trucks would also be very useful too. One thing that worries me that Hummie said about the decks, is that the tips of the ends of the board often split open when they hit something. So I was wondering if a bash guard for the fronts of these could be made which also acts as a mounting plate for the top of the board.
@Skunk Drop through decks should be no different, if not favorable. Because you can insert the wiring through the deck without the need to drill. A tunnel riser might be needed, something similar to this https://www.electric-skateboard.builders/t/official-riptide-sports-custom-esk8-tunnel-riser-group-buy-last-chance-at-discounted-price/57359.
In regards to the case hardware, a washer can be used to spread the force, it should work fairly well.
@uigiroux That should also work.
Do you have estimates on price yet please???
I submitted the design and I’m waiting for the quotes.
Damn dude. You’ve asked this a million times already in this thread. Do you not think @Wajdi will release a price once he has one?
Classic shit from him hahaha
Gorgeous idea !! I missed a lot here, just seeing your pics before ! This is crazy good work, thanks for us Tracking mode on
The top of the deck would not be flat when mounted on a drop through. (Unless you’re not mounting drop) you would be mounting it directly to the trucks baseplate and any overhang would have a gap between display and deck.
This was my thinking too. It seems for a drop through deck setup you’d need some sort of plate that would fit around the top of the trucks that are above the deck so that the Proton could be mounted on a flat surface. Otherwise, as you said, there would be a gap between the module and the deck since it’d be raised up from the drop through trucks.
I was thinking about top mounting the trucks on a drop through deck.
I think there are only a handful of setups that actually support drop through anyway. Most people here will be top mounted for obvious reasons.
Hey guys,
I finally managed to get a production quote for the controller, pre-orders will have a discounted price of $99 for a limited time only, instead of $117.
Now available on https://eboardshop.net
Pre-orders will be shipped in about 24-26 days. In order to power the USB chargers and LED drivers, an external 5V buck converter is needed. They are generally cheap and can be bought for about $3-5.
I’m making a demo video, it should be up in a few days.