New Hummie Hubs!

i’m totally down to wind my own motors i would like to try the higher KV winding i need 4 of them :slight_smile: so this wil be great whats the sators axle mm diameter and are these those 90x79 :smile: 0

90kv or ??? <

how much for the 4 of them and i need to get some helpful links if you can cite me some on the exact winding specs thankd dan

Man I am interested in a set of your hubs, unfortunately $400 is kinda out of my price range. Any chance you could negotiate?

If u want to wind a set of the old that shorted I’ll send u them for 75$ and shipping and send u new tires

EDIT information below is stale. There is a new design, much has changed. Hummie will update in 9/4-9/8 timeframe.

Hey @Hummie, love what you’re doing, but it’s hard to follow what’s going on. :slight_smile:

Please correct me if I’m wrong. I’ll edit the post if forum lets me.

You have a few prototypes of version 4 on hand right now. specs:

  • motor:
    • 59mm diameter
    • 52mm stator
    • steel not aluminum
    • high temp magnets
    • high temp motor wire
    • 90kv
    • hand wound by hummie, both prototypes and production
    • production motors should be ready to ship by 8/20/2017
  • hangar for motor
    • 12mm axle
    • precision
    • paris baseplate compatible
  • wheels for motors
    • 83mm x 81mm, 12mm thick wheel ((83mm-59mm)/2 since these are diameters)
    • similar to ABEC11 Centrax, which are 83x78mm
    • not too tall but wide, which gives plush ride
    • high temp core with high adhesive and mechanical bond to wheel
    • urethane wheel, hopefully soft duros due to core
    • molds and first wheels done by 8/11/2017
  • future wheel
    • 90 x 81 for motor (committed?)
    • matching 90 x 81 non-motor wheels for front (not committed)
  • a version 4 set includes:
    • 2 motors
    • 2 wheels for motors
    • 2 normal wheels, ABEC11 Centrax 83x78
      • NOTE this may change to custom wheels in future
    • 1 custom hanger 12mm precision
    • 1 stock paris hanger 195
    • 2 stock paris baseplates

Are there any differences between what you have on hand now, and what you’ll get on or around the 15th? Price differences?

You’re trying to raise funds to get 90mm wheels made for these version 4 motors. If funds raised, you expect to have moulds done in 3 weeks. How long until you have wheels in hand?

And, all times stated are best case. Actual dates are usually later sometimes much later.

Thanks @evoheyax for filling some details.

4 Likes

Front wheels are the ABEC11 Centrax 83x78mm, motor wheels will be 83x81mm. Slightly wider, but not noticeable to the eye. In the future, I think we will be doing our front wheels also, so we can match the back wheels better.

Motor wheels will be urathene with high heat core. This core design is great and will be impossible to be decored these wheels once poured. Should allow us to use some lower duro stuff. I’m excited to try them out.

90x81 front and motor wheels in the future, since we will need to pour matching front wheels when going up to 90mm. Not an issue now if you run 4wd with them though.

First motors should be ready by the 20th, fixed cans ship the 15th and will arrive within 2 days. Then it’s winding, glueing magnets, and an assembly. Molds for the wheels and first wheels should be done this week.

1 Like

I would even goes as far as to specify 1 custom 12mm hanger. I think this hanger should be able to do even larger motors in the future :slight_smile:

thanks, post updated. A bit more info and things will be more of less clear.

This helps me, and hopefully helps others.

So many exciting things happening for hub motors!

2 Likes

First full filled test wind. I believe it will be about 90-95 kv, but we will see.

26 Likes

:heart_eyes:

10chars

so…beautiful

3 Likes

3 Likes

Can’t wait for your review! What top speed do you expect with 95kv ? around 30mph ?

1 Like

It depends how heavy u are and how big the motor is. On the old small two I could do 30mph w 90kv w two at 150lbs but he’s over 200 and got 25mph I think. But that was w just two small. Parts are suppossed to be shipped the 27th and come in two or three days max. We can see then

5 Likes

cant wait to try these out :slight_smile:

the fuckers, they have been telling me the part would be done the 27th for sure and now it’s turned to “this week” due to some environmental testing or something on the place that does the finish. Never again will I deal with these people. Luckily I have another place making the parts too now. sorry people please hold on tight to your remotes another week.

6 Likes

Can’t wait till these are tested and on the market so I can replace my crappy TorqueBoards hubs.

Keep up the great work Hummie!

4 Likes

Just keep doing what your doing, most people would rather have quality than quick delivery. You don’t impatient people as customers anyways.

2 Likes

thanks. gets a bit tense because all the bucks are out the door and I cant offer a refund immediately and I risk having my paypal account in jeopardy if they pushed for it. and it has been ages

4 Likes