Phase 1 : The Deck
Complete
- 3 layers of wood with epoxy glued and pressed into shape.
- Reinforced with 3 layers glass fiber and a final layer carbon.
- Topcoat on topside with blue Epoxy -Final surface with fluorescent pigments in epoxy
Phase 2 : Trucks & Wheels
Complete
-Enertion trucks -Enertion 83mm Wheels -1/2” Risers
**
Phase 3 : Motor mount , Wheel pulley
** The motor mount is the same as enertion engine mount. I drew them in CAD. The prototype is a 3d printing. The final part is made of aluminum. The Wheel pulley with 36 Tooth will be manufactured by laser sintering of PA12.
## Phase 4 : Electrical Parts + Motor
The VESC from enertion is ordered and will arrive in the next few days. The power supply will be a 9s 8000 mah LIPO Battery. I already have the motor. It’s a SK3 6374 190 kV
**
Next steps:
** -The controller -The carbon fiber enclosure -Motor Pulley -Motor modifications ( Silikon wire ; keyway)